SN CLIENT PROJECTS DURATION JOB DESRIPTION ACTIVITY
1 RIL HAZIRA PBR AG PIPING 16 MONTHS 121000 IND Piping & 85000 INM Fabrication & Erection, 120 MT Equipment Erection Plant Piping & Equipment Work 4 Nos Reactor Erection & Alignment
2 RIL DAHEJ Propane Unloading System 12 MONTHS Structure & Piping Fabrication & Erection , Equipment Erection 27450 INM CS Piping Job, Column, Vessel, Pump, Compressor
3 RIL HAZIRA RELPIPE CAPEX PROJECT 10 MONTHS 500 MT Structure Fabrication & Erection , 12500 IND Piping Fabrication & Erection, 150 MT Equipment Erection Shed Structure, EOT Erection , Micro Duct Extruder & Sheeting Erection & Alignment, IBR Piping
4 RIL HAZIRA ETP OSBL Piping Integration Project 12 MONTHS 27000 IND Piping Fabrication & Erection OSBL Rack Piping , Efficiency Enhancing Purpose
5 RIL DAHEJ Caustic Line Job 12 MONTHS 4 KM Underground Piping – 12” IND NB
6 RIL DAHEJ PTA 5 Piping 8 MONTHS 25000 IND Piping Fabrication & Erection Tanks Farm Piping, Sprinkler Piping & Fire Water Piping in Ware House
7 RIL DAHEJ MEG CRU Revamp Project 6 Months Structure & Piping Fabrication & Erection Job -
8 RIL HAZIRA ASRS CONVEYING SYSTEM & BALE BAGGING 6 Months Structure Erection, Conveyor Erection & Alignment
9 RIL DAHEJ Fabrication of Clarifier Tank 6 Months Fabrication & Erection of 30 M Dia Tank
10 RIL DAHEJ ONGC Ethane Line 6 Months Structure & Piping Fabrication & Erection Job
11 RIL DAHEJ VCM EDS Quality Improvement Scheme 6 Months Structure & Piping Fabrication & Erection Job
12 RIL DAHEJ Piping Modification of PET-03 4 Months 10000 IND Piping Fabrication & Erection
12 RIL DAHEJ HEXANE Distillation Scheme 6 Months Structure & Piping Fabrication & Erection Job
13 RIL DAHEJ CS to SS Piping – MEG Plant 1 Months 5600 IND & 8500 INM Piping Fabrication & Erection
14 RIL HAZIRA CP 11 DM11 CAPEX PROJECT 4 Months 13O MT Structure Fabrication & Erection, 400 MT Equipment Erection & Alignment Draw line Equipment, Bale Carriage, Bale transport. Lifts ,Vessel, Drum, AHU etc
15 RIL HAZIRA PSF SPG BLACK PROJECT 12 Months Piping & Structure Fabrication & Erection