Shutdown and turnaround execution for India’s leading refineries and petrochemical complexes

 

Recently Completed Major Turn Arounds

2025
Project

CDU III & VGO-DHDT TA

Client Name
Nayara Energy Limited
Owner
Nayara Energy Limited
Manpower
100 +
Exchangers
10000
Control Valves
10000
Key Achievement

Successful execution of the main service contract for TA works at CDU III and VGO-DHDT, including replacement of the 2800 mm OD, 25 mm thick VDU transfer line and 143 m of 3 × 3 m duct, with 2,700+ manpower mobilized.

 

• 38 exchangers, 35 vessels, 34 air-fin coolers, 12 columns and 5 heaters handled in a single turnaround.

• 311 control valves, 295 isolation valves and 203 PSV / PVRV overhauled.

• All units completed ahead of plan: CDU in 21 days (planned 23), VGO in 27 days (planned 28) and DHDT in 22 days (planned 23).

2025
Project

Static maintenance services for SLB Main Service Contract during TA 2025

Client Name
Guru Gobind Singh Refinery Bathinda
Owner
HMEL
Manpower
100 +
Safe Man-hours
10000
Safety
10000 LTI
Key Achievement

Turnaround completed ahead of schedule.

 

• Turnkey static maintenance of the Sulphur Block: SRU-1 & 2, SWS-1 & 2 and ARU.

• All five units handed over early, with up to 7 days saved on SWS-2.

• Zero incident throughout execution.

• Performance bonus awarded by the client for early completion.

2025
Project

Cracking Furnace Radiant Coil Replacement, DFCU

Client Name
ONGC Petro additions Limited, Dahej
Owner
OPaL
Furnaces
100
Coil Sets / Furnace
10000
Weld Joints / Furnace
10000
Safety
10000 Incident
Key Achievement

Complete radiant coil replacement in 7 cracking furnaces at the DFCU plant, with 16 coil sets dismantled and erected and 384 tube weld joints (2″ & 3″) per furnace on Inconel (25Cr-35Ni micro-alloy) coils.

 

• Zero weld repairs and zero incident across all furnaces.

• Scope also covered coil-group re-coiling, convection tubes, return bends & elbows and PQE / TLE gas inlet nozzle replacement.

• Executed under a rate contract from October 2023 to September 2025 and completed on schedule.

2025
Project

FCC-NHT Unit TA-26

Client Name
HPCL Visakh Refinery, Visakhapatnam
Owner
HPCL
Furnaces
100
Coil Sets / Furnace
10000
Weld Joints / Furnace
10000
Safety
10000 Incident
Key Achievement

Complete radiant coil replacement in 7 cracking furnaces at the DFCU plant, with 16 coil sets dismantled and erected and 384 tube weld joints (2″ & 3″) per furnace on Inconel (25Cr-35Ni micro-alloy) coils.

 

• Zero weld repairs and zero incident across all furnaces.

• Scope also covered coil-group re-coiling, convection tubes, return bends & elbows and PQE / TLE gas inlet nozzle replacement.

• Executed under a rate contract from October 2023 to September 2025 and completed on schedule.

2025
Project

NIU-NLU Units TA-26

Client Name
HPCL Visakh Refinery, Visakhapatnam
Owner
Hindustan Petroleum Corporation Limited
Key Achievement

Awarded the main service contract for TA-26 of the NIU-NLU units (MS Block) at HPCL Visakh Refinery, executed alongside the FCC-NHT turnaround.

 

• Combined scope across both TA-26 packages: 35 exchangers, 20 air-fin coolers, 31 vessels / filters and 6 columns.

• About 470 isolation valves, 117 control valves, 75 PSVs and 173 hydrotest loops.

• Around 1,000 personnel planned at peak deployment across both units.